So today the concrete got poured and now our slab is now complete.
Friday, 26 May 2017
Monday, 22 May 2017
waffle slab preparation (week 2)
The slab work continues with the waffle pad getting prepared. Steel is placed down and then polystyrene blocks are placed on it with steel above.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Saturday, 20 May 2017
Friday, 19 May 2017
Slab preparation and tiger tails (week 1)
It is so exciting to go past the house each day this week and see work being done.
There are bricks and tiles at the back of the house .
The tiger tail that goes from our neighbours property to across the road got fitted today.
Very heavy rain is expected from tomorrow (Friday) to Sunday. I hope it does not delay anything
There are bricks and tiles at the back of the house .
The tiger tail that goes from our neighbours property to across the road got fitted today.
Very heavy rain is expected from tomorrow (Friday) to Sunday. I hope it does not delay anything
Tuesday, 2 May 2017
Peg out
This is what I found after pegout. I was rather concerned that the peg was close to the pool and thought the house was going to be right on top of the pool. I was then told that it was providing for the scaffolding so I was relieved.
Subscribe to:
Posts (Atom)
Benchtops, basins and painting (week 26)
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
I went to Homeworld Kellyville to see Metricon as I loved the Liberty and the Franklin. The Liberty could not fit on my property but the Fra...
-
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
We were told by Eden Brae that we need a hard cover over our existing pool. We queried this as we had a fence around the pool but the reason...