Some scaffolding was removed after the windows and upper downpipes got painted. Some bricks on the lower level got cleaned (except for where the scaffolding has remained).
The garage has been cleaned and cleared for the lower roof to commence.
Plans for the rest of this week is lower roof, lower eaves and balcony sheeting and frame straightening.
Showing posts with label brick cleaning. Show all posts
Showing posts with label brick cleaning. Show all posts
Wednesday, 20 September 2017
Tuesday, 5 September 2017
Brick cleaning, eaves and downpipes (week 17)
So now that the bricks are complete they are getting cleaned. Top floor bricks have been cleaned.
The top floor has started. Today the eaves got put in and some downpipes.
The top floor has started. Today the eaves got put in and some downpipes.
Subscribe to:
Posts (Atom)
Benchtops, basins and painting (week 26)
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
I went to Homeworld Kellyville to see Metricon as I loved the Liberty and the Franklin. The Liberty could not fit on my property but the Fra...
-
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
Well this was a busy week at the house with all types of activities happening. Firstly, the stairs got put in and are looking great ...