Showing posts with label frames. Show all posts
Showing posts with label frames. Show all posts

Monday, 10 July 2017

more work on the frames and trusses and the gutter and fascia (week 7 & 8)

More work on the frame and roof.

Got an email from our site supervisor on 23 June to say he is on 4 weeks leave commencing today and has another contractor in charge.

We are lucky as we have access to a building from behind our house and so we are able to see the garden view over a fence



This shows a window in our family living room and the media room by the pool. We were shocked to see how close the media room is to the pooll that I sent my 10 year to measure an arms length to know the distance.  It is abour 1 - 1.5m which is smaller than we hoped but not much we can do about it.



A photo from the build watch camera. We can get updated photos every 15 mniutes!












Dune colour fascia was installed







Dune fascia and monument gutter being installed.


Monday, 19 June 2017

Frames continuing (week 5 & 6)

Last week was not very productive due to heavy rain and very wet conditions. A bit of work got done later in the week and even on Saturday. Today they worked hard and started the alfresco and garage frame as well as putting in some windows.













Tuesday, 6 June 2017

Frames (week 4)

Well today it really feels like we are building a house!!

Went past the house at 8:30 to see nothing but a slab and then at 3:45pm the ground floor frames are up.

We could start working out where the rooms are etc and it is so exciting.

Rain is predicted for the rest of the week but hopefully only at night.












Benchtops, basins and painting (week 26)

There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...