Our glass fence and part of our retaining wall had to get removed and was completed today.
Showing posts with label waffle pod. Show all posts
Showing posts with label waffle pod. Show all posts
Monday, 22 May 2017
waffle slab preparation (week 2)
The slab work continues with the waffle pad getting prepared. Steel is placed down and then polystyrene blocks are placed on it with steel above.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Subscribe to:
Posts (Atom)
Benchtops, basins and painting (week 26)
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
I went to Homeworld Kellyville to see Metricon as I loved the Liberty and the Franklin. The Liberty could not fit on my property but the Fra...
-
Drove past the house on Monday morning to see a Fab kitchens truck in the driveway delivering our kitchen and bathroom cabinets. Very happ...