Monday 22 May 2017

waffle slab preparation (week 2)

The slab work continues with the waffle pad getting prepared. Steel is placed down and then polystyrene blocks are placed on it with steel above.

Our glass fence and part of our retaining wall had to get removed and was completed today.
























Saturday 20 May 2017

slab continues

I drove past the house this morning and saw more work being done . The piers are awaiting.





Friday 19 May 2017

Slab preparation and tiger tails (week 1)

It is so exciting to go past the house each day this week and see work being done.

There are bricks and tiles at the back of the house .

The tiger tail that goes from our neighbours property to across the road got fitted today.

Very heavy rain is expected from tomorrow (Friday) to Sunday. I hope it does not delay anything

















Tuesday 2 May 2017

Peg out


This is what I found after pegout. I was rather concerned that the peg was close to the pool and thought the house was going to be right on top of the pool. I was then told that it was providing for the scaffolding so I was relieved.











Benchtops, basins and painting (week 26)

There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...