So today the concrete got poured and now our slab is now complete.
Friday 26 May 2017
Monday 22 May 2017
waffle slab preparation (week 2)
The slab work continues with the waffle pad getting prepared. Steel is placed down and then polystyrene blocks are placed on it with steel above.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Our glass fence and part of our retaining wall had to get removed and was completed today.
Saturday 20 May 2017
Friday 19 May 2017
Slab preparation and tiger tails (week 1)
It is so exciting to go past the house each day this week and see work being done.
There are bricks and tiles at the back of the house .
The tiger tail that goes from our neighbours property to across the road got fitted today.
Very heavy rain is expected from tomorrow (Friday) to Sunday. I hope it does not delay anything
There are bricks and tiles at the back of the house .
The tiger tail that goes from our neighbours property to across the road got fitted today.
Very heavy rain is expected from tomorrow (Friday) to Sunday. I hope it does not delay anything
Tuesday 2 May 2017
Peg out
This is what I found after pegout. I was rather concerned that the peg was close to the pool and thought the house was going to be right on top of the pool. I was then told that it was providing for the scaffolding so I was relieved.
Subscribe to:
Posts (Atom)
Benchtops, basins and painting (week 26)
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...
-
Well this was a busy week at the house with all types of activities happening. Firstly, the stairs got put in and are looking great ...
-
I have been wanting to update the progress of our Eden Brae Waldorf 42 (opal facade) for ages but never find the time. Our timeli...