Showing posts with label week 24. Show all posts
Showing posts with label week 24. Show all posts

Tuesday, 24 October 2017

Wet area tiling (week 24)

The wet tile area got prepared and the tiles have been laid. The wet area wall tiles as well as the balcony have been tiled. Now waiting for grouting etc to be done.

The kitchen cabinets are still not all up due to some error. Hopefully it will get fixed up soon.

Abbey blinds and Shutters are coming to measure our windows next week so they can start manufacturing our roller blinds.





Cabinets and tiling (week 24)

Drove past the house on Monday morning to see a Fab kitchens truck in the driveway delivering our kitchen and bathroom cabinets.

Very happy with how the cabinets came out. The colour is Polar White in natural finish.


Kitchen counter against the wall - still needs more cabinets and a rangehood


                                                            Island cabinet in kitchen


Inside kitchen cabinet - double bins in cupboard

Island kitchen cabinet with 60cm cutlery draws


Laundry cabinet by the window with mineralstone laminex counter.


Laundry side counter. Left side is for the tumble dryer and thinking about wire shelves to keep washing in or otherwise laundry baskets.

Butlers pantry leading to laundry



Butlers pantry


Kitchen

Bathroom cabinet in Silver Riftwood Laminex - love the colour (photo does not show true colour)

                                                                        Linen cupboards







Benchtops, basins and painting (week 26)

There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...