Monday 22 May 2017

waffle slab preparation (week 2)

The slab work continues with the waffle pad getting prepared. Steel is placed down and then polystyrene blocks are placed on it with steel above.

Our glass fence and part of our retaining wall had to get removed and was completed today.
























No comments:

Post a Comment

Benchtops, basins and painting (week 26)

There has been a lot happening in the house the past two weeks, The painting has continued, the wet area tiing is complete, all architraves ...